Çankaya GCRIS Standart veritabanının içerik oluşturulması ve kurulumu Research Ecosystems (https://www.researchecosystems.com) tarafından devam etmektedir. Bu süreçte gördüğünüz verilerde eksikler olabilir.
 

Multi-manned assembly line balancing problems with sequence-dependent setup times

No Thumbnail Available

Date

2017

Authors

Güner, Funda
Kellegöz, T.
Toklu, B.

Journal Title

Journal ISSN

Volume Title

Publisher

Open Access Color

OpenAIRE Downloads

OpenAIRE Views

Research Projects

Organizational Units

Journal Issue

Events

Abstract

In the production of large-size products (such as automobiles, buses, trucks etc.), designing assembly lines with multi-manned workstations may provide decreasing number of total workstations, requirement of large plant area and product flow time. Depending on the characteristics of the tasks about to be started and the one just completed on the same worker, setup times may be significant. Therefore, in some real life situations, it is possible to see setup times between tasks processed successively. In this study, assembly line balancing problems with multi-manned workstations and sequence dependent setup times are addressed. The formal definition of the problem is firstly presented. Then, its mixed integer programming formulation and is developed. In the computational study, by using these formulations, a set of test instances is solved, and results are provided.

Description

Keywords

Assembly Line Balancing, Multi-Manned Workstations, Sequence Dependent Setups

Turkish CoHE Thesis Center URL

Fields of Science

Citation

Güner, Funda; Kellegöz, T.; Toklu, B. (2017). "Multi-manned assembly line balancing problems with sequence-dependent setup times", Proceedings of International Conference on Computers and Industrial Engineering, CIE, Lisbon, 11 October 2017 through 13 October 2017.

WoS Q

Scopus Q

Source

Proceedings of International Conference on Computers and Industrial Engineering, CIE

Volume

Issue

Start Page

End Page