A Constraint Programming Approach To A Real-World Workforce Scheduling Problem For Multi-Manned Assembly Lines With Sequence-Dependent Setup Times

No Thumbnail Available

Date

2023

Journal Title

Journal ISSN

Volume Title

Publisher

Open Access Color

OpenAIRE Downloads

OpenAIRE Views

Research Projects

Organizational Units

Journal Issue

Events

Abstract

For over five decades, researchers have presented various assembly line problems. Recently, assembly lines with multiple workers at each workstation have become very common in the literature. These lines are often found in the manufacturing of large vehicles, where workers at a workstation may perform their assigned tasks at the same time. Most research on multi-manned assembly lines focuses on balancing tasks and workers among workstations and scheduling tasks for workers. This study, however, concentrates on assigning tasks to workers already assigned to a specific workstation, rather than balancing the entire line. The problem was identified through an industrial case study at a large vehicle manufacturing company. The study presents two methods, one using mixed integer linear programming and the other using constraint programming, to minimise the number of workers required on a multi-manned assembly line with sequence-dependent setup times. The results of the computational experiments indicate that the constraint programming method performs better than the mixed integer linear programming method on several modified benchmark instances from the literature. The constraint programming model is also tested on the real-world scenario of our industrial case study and leads to significant improvements in the productivity of the workstations.

Description

Keywords

Workforce Scheduling, Multi-Manned Assembly Line, Constraint Programming, Sequence-Dependent Setup Times, Mixed Integer Linear Programming

Turkish CoHE Thesis Center URL

Fields of Science

Citation

Güner, Funda...et al. (2023). "A Constraint Programming Approach To A Real-World Workforce Scheduling Problem For Multi-Manned Assembly Lines With Sequence-Dependent Setup Times", International Journal Of Production Research.

WoS Q

Scopus Q

Source

International Journal Of Production Research

Volume

Issue

Start Page

End Page