A Constraint Programming Approach To a Real-World Workforce Scheduling Problem for Multi-Manned Assembly Lines With Sequence-Dependent Setup Times

dc.contributor.author Kandiller, Levent
dc.contributor.author Drake, John H.
dc.contributor.author Guner, Funda
dc.contributor.author Gorur, Abdul K.
dc.contributor.author Satir, Benhur
dc.contributor.authorID 54700 tr_TR
dc.contributor.other 06.04. Endüstri Mühendisliği
dc.contributor.other 06. Mühendislik Fakültesi
dc.contributor.other 01. Çankaya Üniversitesi
dc.date.accessioned 2023-11-14T07:32:47Z
dc.date.accessioned 2025-09-18T12:09:42Z
dc.date.available 2023-11-14T07:32:47Z
dc.date.available 2025-09-18T12:09:42Z
dc.date.issued 2024
dc.description Guner, Funda/0000-0001-8655-5768; Satir, Benhur/0000-0001-6334-5880 en_US
dc.description.abstract For over five decades, researchers have presented various assembly line problems. Recently, assembly lines with multiple workers at each workstation have become very common in the literature. These lines are often found in the manufacturing of large vehicles, where workers at a workstation may perform their assigned tasks at the same time. Most research on multi-manned assembly lines focuses on balancing tasks and workers among workstations and scheduling tasks for workers. This study, however, concentrates on assigning tasks to workers already assigned to a specific workstation, rather than balancing the entire line. The problem was identified through an industrial case study at a large vehicle manufacturing company. The study presents two methods, one using mixed integer linear programming and the other using constraint programming, to minimise the number of workers required on a multi-manned assembly line with sequence-dependent setup times. The results of the computational experiments indicate that the constraint programming method performs better than the mixed integer linear programming method on several modified benchmark instances from the literature. The constraint programming model is also tested on the real-world scenario of our industrial case study and leads to significant improvements in the productivity of the workstations. en_US
dc.description.publishedMonth 7
dc.description.sponsorship Ministry of Industry and Technology [00695.STZ.2010-2]; Scientific and Technological Research Council of Turkey (TUBITAK) [BIDEB-2219]; International Postdoctoral Research Fellowship Programme [1059B192001243] en_US
dc.description.sponsorship This study was funded by the Ministry of Industry and Technology [grant number: 00695.STZ.2010-2]. This study was supported by the Scientific and Technological Research Council of Turkey (TUBITAK) under the BIDEB-2219 International Postdoctoral Research Fellowship Programme grant number 1059B192001243. en_US
dc.identifier.citation Güner, Funda...et al. (2023). "A Constraint Programming Approach To A Real-World Workforce Scheduling Problem For Multi-Manned Assembly Lines With Sequence-Dependent Setup Times", International Journal Of Production Research. en_US
dc.identifier.doi 10.1080/00207543.2023.2226772
dc.identifier.issn 0020-7543
dc.identifier.issn 1366-588X
dc.identifier.scopus 2-s2.0-85165156864
dc.identifier.uri https://doi.org/10.1080/00207543.2023.2226772
dc.identifier.uri https://hdl.handle.net/123456789/11484
dc.language.iso en en_US
dc.publisher Taylor & Francis Ltd en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject Workforce Scheduling en_US
dc.subject Multi-Manned Assembly Line en_US
dc.subject Constraint Programming en_US
dc.subject Sequence-Dependent Setup Times en_US
dc.subject Mixed Integer Linear Programming en_US
dc.title A Constraint Programming Approach To a Real-World Workforce Scheduling Problem for Multi-Manned Assembly Lines With Sequence-Dependent Setup Times en_US
dc.title A Constraint Programming Approach To A Real-World Workforce Scheduling Problem For Multi-Manned Assembly Lines With Sequence-Dependent Setup Times tr_TR
dc.type Article en_US
dspace.entity.type Publication
gdc.author.id Guner, Funda/0000-0001-8655-5768
gdc.author.id Satir, Benhur/0000-0001-6334-5880
gdc.author.institutional Kandiller, Levent
gdc.author.institutional Satır, Benhür
gdc.author.scopusid 57200337656
gdc.author.scopusid 7006606908
gdc.author.scopusid 55042774000
gdc.author.scopusid 6506822666
gdc.author.scopusid 55360588500
gdc.author.wosid Kandiller, Levent/B-3392-2019
gdc.author.wosid Güner, Funda/Y-6322-2018
gdc.author.wosid Görür, Abdül Kadir/Aay-1590-2021
gdc.author.wosid Satir, Benhur/Gya-5988-2022
gdc.description.department Çankaya University en_US
gdc.description.departmenttemp [Guner, Funda; Satir, Benhur] Cankaya Univ, Dept Ind Engn, Ankara, Turkiye; [Gorur, Abdul K.] Cankaya Univ, Software Engn, Ankara, Turkiye; [Kandiller, Levent] Yasar Univ, Dept Ind Engn, Izmir, Turkiye; [Guner, Funda; Drake, John H.] Univ Leicester, Sch Comp & Math Sci, Leicester, England en_US
gdc.description.endpage 3229 en_US
gdc.description.issue 9 en_US
gdc.description.publicationcategory Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı en_US
gdc.description.scopusquality Q1
gdc.description.startpage 3212 en_US
gdc.description.volume 62 en_US
gdc.description.woscitationindex Science Citation Index Expanded
gdc.description.wosquality Q1
gdc.identifier.openalex W4384341344
gdc.identifier.wos WOS:001027499700001
gdc.openalex.fwci 3.99719218
gdc.openalex.normalizedpercentile 0.93
gdc.openalex.toppercent TOP 10%
gdc.opencitations.count 9
gdc.plumx.crossrefcites 4
gdc.plumx.mendeley 16
gdc.plumx.scopuscites 15
gdc.scopus.citedcount 15
gdc.wos.citedcount 12
relation.isAuthorOfPublication ae1b55aa-7f90-4c8c-bbb6-b27b46a3aaa5
relation.isAuthorOfPublication 7c741235-e13b-4357-92b9-55ce8167f42f
relation.isAuthorOfPublication.latestForDiscovery ae1b55aa-7f90-4c8c-bbb6-b27b46a3aaa5
relation.isOrgUnitOfPublication b13b59c3-89ea-4b50-b3b2-394f7f057cf8
relation.isOrgUnitOfPublication 43797d4e-4177-4b74-bd9b-38623b8aeefa
relation.isOrgUnitOfPublication 0b9123e4-4136-493b-9ffd-be856af2cdb1
relation.isOrgUnitOfPublication.latestForDiscovery b13b59c3-89ea-4b50-b3b2-394f7f057cf8

Files