Topan, EnginTopan, EnginBayindir, Z. PelinTan, TarkanEndüstri Mühendisliği2016-06-102016-06-102010Topan,E., Bayındır, Z.P., Tan,T. (2010). An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse. Operations Research Letters, 38(5), 454-461. http://dx.doi.org/10.1016/j.orl.2010.05.0060167-6377https://doi.org/10.1016/j.orl.2010.05.006Bayindir, Z. Pelin/0000-0002-8473-1382We consider a multi-item two-echelon inventory system in which the central warehouse operates under a (Q, R) policy, and the local warehouses implement basestock policy. An exact solution procedure is proposed to find the inventory control policy parameters that minimize the system-wide inventory holding and fixed ordering cost subject to an aggregate mean response time constraint at each facility. (C) 2010 Elsevier B.V. All rights reserved.eninfo:eu-repo/semantics/openAccessInventoryBranch And PriceTwo-EchelonMulti-ItemBatch OrderingSpare PartsAn exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouseAn Exact Solution Procedure for Multi-Item Two-Echelon Spare Parts Inventory Control Problem With Batch Ordering in the Central WarehouseArticle38545446110.1016/j.orl.2010.05.0062-s2.0-77957926110WOS:000282458100024Q4Q4