Bilgilendirme: Sürüm Güncellemesi ve versiyon yükseltmesi nedeniyle, geçici süreyle zaman zaman kesintiler yaşanabilir ve veri içeriğinde değişkenlikler gözlemlenebilir. Göstereceğiniz anlayış için teşekkür ederiz.
 

Multi-Manned Assembly Line Balancing Problems With Sequence-Dependent Setup Times

dc.contributor.author Güner, F.
dc.contributor.author Güner, Funda
dc.contributor.author Kellegöz, T.
dc.contributor.author Toklu, B.
dc.contributor.authorID 17931 tr_TR
dc.contributor.other Çankaya Meslek Yüksekokulu
dc.contributor.other 08.02. Çankaya Meslek Yüksekokulu
dc.contributor.other 08. Meslek Yüksekokulları
dc.contributor.other 01. Çankaya Üniversitesi
dc.date.accessioned 2025-09-23T12:48:24Z
dc.date.available 2025-09-23T12:48:24Z
dc.date.issued 2017
dc.description.abstract In the production of large-size products (such as automobiles, buses, trucks etc.), designing assembly lines with multi-manned workstations may provide decreasing number of total workstations, requirement of large plant area and product flow time. Depending on the characteristics of the tasks about to be started and the one just completed on the same worker, setup times may be significant. Therefore, in some real life situations, it is possible to see setup times between tasks processed successively. In this study, assembly line balancing problems with multi-manned workstations and sequence dependent setup times are addressed. The formal definition of the problem is firstly presented. Then, its mixed integer programming formulation and is developed. In the computational study, by using these formulations, a set of test instances is solved, and results are provided. en_US
dc.identifier.citation Güner, Funda; Kellegöz, T.; Toklu, B. (2017). "Multi-manned assembly line balancing problems with sequence-dependent setup times", Proceedings of International Conference on Computers and Industrial Engineering, CIE, Lisbon, 11 October 2017 through 13 October 2017. en_US
dc.identifier.issn 2164-8689
dc.identifier.scopus 2-s2.0-85040934025
dc.identifier.uri https://hdl.handle.net/20.500.12416/15252
dc.language.iso en en_US
dc.publisher Curran Associates Inc. en_US
dc.relation.ispartof Proceedings of International Conference on Computers and Industrial Engineering, CIE -- 47th International Conference on Computers and Industrial Engineering: How Digital Platforms and Industrial Engineering are Transforming Industry and Services, CIE 2017 -- 11 October 2017 through 13 October 2017 -- Lisbon -- 133146 en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject Assembly Line Balancing en_US
dc.subject Multi-Manned Workstations en_US
dc.subject Sequence Dependent Setups en_US
dc.title Multi-Manned Assembly Line Balancing Problems With Sequence-Dependent Setup Times en_US
dc.title Multi-manned assembly line balancing problems with sequence-dependent setup times tr_TR
dc.type Conference Object en_US
dspace.entity.type Publication
gdc.author.institutional Güner, Funda
gdc.author.scopusid 57200337656
gdc.author.scopusid 24166901700
gdc.author.scopusid 6508265096
gdc.description.department Çankaya University en_US
gdc.description.departmenttemp Güner F., Department of Industrial Engineering, Çankaya University, Ankara, Turkey; Kellegöz T., Department of Industrial Engineering, Gazi University, Ankara, Turkey; Toklu B., Department of Industrial Engineering, Gazi University, Ankara, Turkey en_US
gdc.description.publicationcategory Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı en_US
gdc.description.volume 0 en_US
gdc.scopus.citedcount 1
relation.isAuthorOfPublication dd66036f-4e47-4b85-a11e-5a6519d75146
relation.isAuthorOfPublication.latestForDiscovery dd66036f-4e47-4b85-a11e-5a6519d75146
relation.isOrgUnitOfPublication 7c88ca73-4d3e-47ac-8ae4-4af974598186
relation.isOrgUnitOfPublication 7195f753-8f55-46df-92cd-c1bc758aa64c
relation.isOrgUnitOfPublication 0b9123e4-4136-493b-9ffd-be856af2cdb1
relation.isOrgUnitOfPublication.latestForDiscovery 7c88ca73-4d3e-47ac-8ae4-4af974598186

Files