Bilgilendirme: Kurulum ve veri kapsamındaki çalışmalar devam etmektedir. Göstereceğiniz anlayış için teşekkür ederiz.
 

Customer Order Scheduling With Job - Based Processing and Lot Streaming in a Two - Machine Flow Shop

dc.contributor.author Çetinkaya, F.C.
dc.contributor.author Yozgat, G.B.
dc.date.accessioned 2025-05-13T11:50:34Z
dc.date.available 2025-05-13T11:50:34Z
dc.date.issued 2022
dc.description.abstract This study introduces a new variant of the customer order scheduling (COS) problem in which each customer orders several products processed in a two-machine flow shop. Customers' orders are satisfied by the job-based processing approach in which the same products ordered by different customers form a product lot (job). Each customer's order for a product is processed as a sublot (batch) of identical products processed together by the same machine without intermingling the sublots of other products. A sequence-independent attached setup on each machine is required before starting the process of a product lot. Each customer order is delivered in a single shipment when processing all products in that customer order is finished. The aim is to construct an optimal schedule of product lots and the sublots' sequence in every job lot by minimizing the sum of completion times of the customer orders. In our study, a mixed-integer linear programming (MILP) model and a multi-phase heuristic algorithm are developed for solving the problem. The computational experiments reveal that the proposed model solves the small-scale problem instances with and without setups optimally within three hours of a run-time limit. However, our proposed algorithm finds optimal or near-optimal solutions for the medium and large-scale problem instances in less than five seconds. © 2022 Iran University of Science and Technology. All rights reserved. en_US
dc.identifier.doi 10.22068/ijiepr.33.2.11
dc.identifier.issn 2008-4889
dc.identifier.scopus 2-s2.0-85137708230
dc.identifier.uri https://doi.org/10.22068/ijiepr.33.2.11
dc.identifier.uri https://hdl.handle.net/20.500.12416/9727
dc.language.iso en en_US
dc.publisher Iran University of Science and Technology en_US
dc.relation.ispartof International Journal of Industrial Engineering and Production Research en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject Customer Order Scheduling en_US
dc.subject Heuristic Algorithm en_US
dc.subject Job-Based Processing en_US
dc.subject Lot Streaming en_US
dc.subject Mixed-Integer Linear Programming en_US
dc.subject Total Completion Time en_US
dc.subject Two-Machine Flow Shop en_US
dc.title Customer Order Scheduling With Job - Based Processing and Lot Streaming in a Two - Machine Flow Shop en_US
dc.type Article en_US
dspace.entity.type Publication
gdc.author.scopusid 24754565700
gdc.author.scopusid 57884895800
gdc.bip.impulseclass C5
gdc.bip.influenceclass C5
gdc.bip.popularityclass C5
gdc.coar.access metadata only access
gdc.coar.type text::journal::journal article
gdc.description.department Çankaya University en_US
gdc.description.departmenttemp Çetinkaya F.C., Department of Industrial Engineering, Faculty of Engineering, Çankaya University, Ankara, Turkey; Yozgat G.B., Defence Industries Research and Development Institute, Scientific and Technological Research Council of Turkey, Ankara, Turkey en_US
gdc.description.issue 2 en_US
gdc.description.publicationcategory Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı en_US
gdc.description.scopusquality Q4
gdc.description.volume 33 en_US
gdc.description.wosquality N/A
gdc.index.type Scopus
gdc.oaire.accesstype GOLD
gdc.oaire.diamondjournal false
gdc.oaire.impulse 0.0
gdc.oaire.influence 2.4895952E-9
gdc.oaire.isgreen false
gdc.oaire.keywords total completion time
gdc.oaire.keywords lot streaming
gdc.oaire.keywords Technology
gdc.oaire.keywords T
gdc.oaire.keywords two-machine flow shop
gdc.oaire.keywords heuristic algorithm
gdc.oaire.keywords mixed-integer linear programming
gdc.oaire.keywords customer order scheduling
gdc.oaire.keywords job-based processing
gdc.oaire.popularity 1.7808596E-9
gdc.oaire.publicfunded false
gdc.opencitations.count 0
gdc.plumx.mendeley 61
gdc.plumx.scopuscites 6
gdc.scopus.citedcount 3
gdc.virtual.author Çetinkaya, Ferda Can
relation.isAuthorOfPublication df14a9fd-44c7-4ff0-a3c3-81ad24b82570
relation.isAuthorOfPublication.latestForDiscovery df14a9fd-44c7-4ff0-a3c3-81ad24b82570
relation.isOrgUnitOfPublication b13b59c3-89ea-4b50-b3b2-394f7f057cf8
relation.isOrgUnitOfPublication 43797d4e-4177-4b74-bd9b-38623b8aeefa
relation.isOrgUnitOfPublication 0b9123e4-4136-493b-9ffd-be856af2cdb1
relation.isOrgUnitOfPublication.latestForDiscovery b13b59c3-89ea-4b50-b3b2-394f7f057cf8

Files