Environmental risk assessment of small hydropower (SHP) plants: A case study for Tefen SHP plant on Filyos River
No Thumbnail Available
Date
2014
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Elsevier Science BV
Open Access Color
OpenAIRE Downloads
OpenAIRE Views
Abstract
A multi-criteria scoring tool is used to assess the environmental risk level of small hydropower plants on the basis of documented evidence, measured data, and on-site observations. The assessment is based on evaluating compliance with the standards of the European Bank for Reconstruction and Development (EBRD). The following environmental criteria are assessed: environmental flow, water quality, fish passage and protection, watershed protection, threatened and endangered species. I evaluated the Tefen hydropower plant, which has been in operation on the Filyos River in northwestern Turkey since 2011. The assessment showed that the plant failed all of the EBRD criteria. (C) 2013 International Energy Initiative.
Description
Keywords
Small Hydropower, Environmental Risk Assessment, Turkey
Turkish CoHE Thesis Center URL
Fields of Science
Citation
Küçükali, Serhat, "Environmental risk assessment of small hydropower (SHP) plants: A case study for Tefen SHP plant on Filyos River" Energy For Sustainable Development, Vol.19, pp.102-110, (2014).
WoS Q
Scopus Q
Source
Energy For Sustainable Development
Volume
19
Issue
Start Page
102
End Page
110