Bilgilendirme: Sürüm Güncellemesi ve versiyon yükseltmesi nedeniyle, geçici süreyle zaman zaman kesintiler yaşanabilir ve veri içeriğinde değişkenlikler gözlemlenebilir. Göstereceğiniz anlayış için teşekkür ederiz.
 

Assessment of the Effectiveness and the Initial Cost Efficiency of Hot Recycled Asphalt Using Polymer Modified Bitumen

No Thumbnail Available

Date

2023

Journal Title

Journal ISSN

Volume Title

Publisher

Elsevier

Open Access Color

OpenAIRE Downloads

OpenAIRE Views

Research Projects

Journal Issue

Abstract

The drastic increase in environmental concerns and increasing costs of road construction materials necessitate evaluating some alternative solutions. One of the most suitable alternatives is recycling old asphalt pavement to produce reclaimed asphalt pavement (RAP). The RAP materials have been commonly combined with asphalt mixtures during pavement construction. Incorporating RAP material should demonstrate an equivalent or better performance than conventional asphalt mixtures. Conversely, the inclusion of RAP mainly needs to improve performance compared to conventional asphalt mixtures. The key issue of using RAP is to restore the loss properties of aged materials and normally asphalt Agent Rejuvenator (ARA) was used. Also, adding polymers with RAP into the asphalt mixture becomes necessary to obtain the required performance. This study investigated the RAP effects of elastomeric polymer on the performance of the asphalt mixture following Russian standards (GOST). The impact of using PMB with RAP material on the asphalt mixture's performance was primarily considered by employing tests that can reveal the adhesion property. Additionally, the performance of the pavement was evaluated in terms of strength and low-temperature cracking. For this purpose, numerous test methods were implemented to appraise the asphalt performance, such as compressive strength, moisture susceptibility, shear resistance, tensile strength, porosity of the mineral particles, and residual porosity. The results indicated that the overall performance of the asphalt mixtures prepared with RAP and combined with polymer depicted a better performance. Moreover, the initial construction cost for each asphalt composition was estimated and compared. The utilization of PMB increased the cost of the asphalt mixture. However, such an increase in the cost would lead to an increase in the overall performance, especially for RAP mixtures.

Description

Almusawi, Ali/0000-0002-4507-2492

Keywords

Reclaimed Asphalt Pavements, Recycling, Polymer Bitumen, Adhesion, Asphalt Performance

Turkish CoHE Thesis Center URL

Fields of Science

Citation

Almusawi, Ali; Shoman, Sarmad; Lupanov, Andrei P.;...et.al. (2023). "Assessment of the effectiveness and the initial cost efficiency of hot recycled asphalt using polymer modified bitumen", Case Studies in Construction Materials; Vol.18

WoS Q

Q1

Scopus Q

Q1
OpenCitations Logo
OpenCitations Citation Count
N/A

Source

Volume

18

Issue

Start Page

End Page

PlumX Metrics
Citations

Scopus : 15

Captures

Mendeley Readers : 39

SCOPUS™ Citations

15

checked on Nov 24, 2025

Web of Science™ Citations

11

checked on Nov 24, 2025

Google Scholar Logo
Google Scholar™
OpenAlex Logo
OpenAlex FWCI
2.45408381

Sustainable Development Goals

SDG data is not available