Bilgilendirme: Sürüm Güncellemesi ve versiyon yükseltmesi nedeniyle, geçici süreyle zaman zaman kesintiler yaşanabilir ve veri içeriğinde değişkenlikler gözlemlenebilir. Göstereceğiniz anlayış için teşekkür ederiz.
 

An Integrated Scheduling and Control Model for Multi-Mode Projects

dc.contributor.author Hazir, Oncu
dc.contributor.author Schmidt, Klaus Werner
dc.contributor.authorID 4168 tr_TR
dc.contributor.other 06.08. Mekatronik Mühendisliği
dc.contributor.other 06. Mühendislik Fakültesi
dc.contributor.other 01. Çankaya Üniversitesi
dc.date.accessioned 2017-06-08T11:54:11Z
dc.date.accessioned 2025-09-18T14:09:24Z
dc.date.available 2017-06-08T11:54:11Z
dc.date.available 2025-09-18T14:09:24Z
dc.date.issued 2013
dc.description Schmidt, Ece Guran/0000-0002-4062-389X; Hazir, Oncu/0000-0003-0183-8772 en_US
dc.description.abstract In today's highly competitive uncertain project environments, it is of crucial importance to develop analytical models and algorithms to schedule and control project activities so that the deviations from the project objectives are minimized. This paper addresses the integrated scheduling and control in multi-mode project environments. We propose an optimization model that models the dynamic behavior of projects and integrates optimal control into a practically relevant project scheduling problem. From the scheduling perspective, we address the discrete time/cost trade-off problem, whereas an optimal control formulation is used to capture the effect of project control. Moreover, we develop a solution algorithm for two particular instances of the optimal project control. This algorithm combines a tabu search strategy and nonlinear programming. It is applied to a large scale test bed and its efficiency is tested by means of computational experiments. To the best of our knowledge, this research is the first application of optimal control theory to multi-mode project networks. The models and algorithms developed in this research are targeted as a support tool for project managers in both scheduling and deciding on the timing and quantity of control activities. en_US
dc.description.publishedMonth 6
dc.identifier.citation Öncü, H., Schmidt, K.W. (2013). An integrated scheduling and control model for multi-mode projects. Flexible Services And Manufacturing Journal, 25(1-2), 230-254. http://dx.doi.org/10.1007/s10696-012-9138-3 en_US
dc.identifier.doi 10.1007/s10696-012-9138-3
dc.identifier.issn 1936-6582
dc.identifier.scopus 2-s2.0-84872675946
dc.identifier.uri https://doi.org/10.1007/s10696-012-9138-3
dc.identifier.uri https://hdl.handle.net/20.500.12416/13357
dc.language.iso en en_US
dc.publisher Springer en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject Project Scheduling en_US
dc.subject Project Control en_US
dc.subject Optimal Control Theory en_US
dc.title An Integrated Scheduling and Control Model for Multi-Mode Projects en_US
dc.title An integrated scheduling and control model for multi-mode projects tr_TR
dc.type Article en_US
dspace.entity.type Publication
gdc.author.id Schmidt, Ece Guran/0000-0002-4062-389X
gdc.author.id Hazir, Oncu/0000-0003-0183-8772
gdc.author.institutional Schmıdt, Klaus Werner
gdc.author.scopusid 23034277700
gdc.author.scopusid 55464613900
gdc.author.wosid Schmidt, Klaus/Abb-8956-2020
gdc.author.wosid Hazir, Oncu/C-8920-2013
gdc.description.department Çankaya University en_US
gdc.description.departmenttemp [Hazir, Oncu] Cankaya Univ, Dept Ind Engn, Ankara, Turkey; [Schmidt, Klaus Werner] Cankaya Univ, Dept Mechatron Engn, Ankara, Turkey en_US
gdc.description.endpage 254 en_US
gdc.description.issue 1-2 en_US
gdc.description.publicationcategory Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı en_US
gdc.description.scopusquality Q2
gdc.description.startpage 230 en_US
gdc.description.volume 25 en_US
gdc.description.woscitationindex Science Citation Index Expanded
gdc.description.wosquality Q2
gdc.identifier.openalex W2035718804
gdc.identifier.wos WOS:000313821700011
gdc.openalex.fwci 1.91727628
gdc.openalex.normalizedpercentile 0.87
gdc.opencitations.count 9
gdc.plumx.crossrefcites 6
gdc.plumx.mendeley 29
gdc.plumx.scopuscites 9
gdc.scopus.citedcount 9
gdc.wos.citedcount 9
relation.isAuthorOfPublication ec56c293-1f64-49af-b5ae-5ae41cb32f1b
relation.isAuthorOfPublication.latestForDiscovery ec56c293-1f64-49af-b5ae-5ae41cb32f1b
relation.isOrgUnitOfPublication 5b0b2c59-0735-4593-b820-ff3847d58827
relation.isOrgUnitOfPublication 43797d4e-4177-4b74-bd9b-38623b8aeefa
relation.isOrgUnitOfPublication 0b9123e4-4136-493b-9ffd-be856af2cdb1
relation.isOrgUnitOfPublication.latestForDiscovery 5b0b2c59-0735-4593-b820-ff3847d58827

Files