Discrete Time/Cost Trade-Off Problem: a Decomposition-Based Solution Algorithm for the Budget Version
| dc.contributor.author | Hazir, Oencue | |
| dc.contributor.author | Haouari, Mohamed | |
| dc.contributor.author | Erel, Erdal | |
| dc.date.accessioned | 2016-05-12T11:41:26Z | |
| dc.date.accessioned | 2025-09-18T16:08:32Z | |
| dc.date.available | 2016-05-12T11:41:26Z | |
| dc.date.available | 2025-09-18T16:08:32Z | |
| dc.date.issued | 2010 | |
| dc.description | Hazir, Oncu/0000-0003-0183-8772; Haouari, Mohamed/0000-0003-0767-8220 | en_US |
| dc.description.abstract | This paper investigates the budget variant of the discrete time/cost trade-off problem (DTCTP). This multi-mode project scheduling problem requires assigning modes to the activities of a project so that the total completion time is minimized and the budget and the precedence constraints are satisfied. This problem is often encountered in practice as timely completion of the projects without exceeding the budget is crucial. The contribution of this paper to the literatures is to describe an effective Benders Decomposition-based exact algorithm to solve the DTCTP instances of realistic sizes. Although Benders Decomposition often exhibits a very slow convergence, we have included several algorithmic features to enhance the performance of the proposed tailored approach. Computational results attest to the efficacy of the proposed algorithm, which can solve large-scale instances to optimality. (C) 2009 Elsevier Ltd. All rights reserved. | en_US |
| dc.description.sponsorship | Research Chair for Advanced Manufacturing Technology | en_US |
| dc.description.sponsorship | Dr. Mohamed Haouari would like to thank Fatimah Alnijris' Research Chair for Advanced Manufacturing Technology for the financial support provided for this research. | en_US |
| dc.identifier.citation | Hazır, Ö., Haouari, M., Erel, E. (2010). Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version. Computer & Operations Research, 37(4), 649-655. http://dx.doi.org/10.1016/j.cor.2009.06.009 | en_US |
| dc.identifier.doi | 10.1016/j.cor.2009.06.009 | |
| dc.identifier.issn | 0305-0548 | |
| dc.identifier.issn | 1873-765X | |
| dc.identifier.scopus | 2-s2.0-70350566565 | |
| dc.identifier.uri | https://doi.org/10.1016/j.cor.2009.06.009 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.12416/15089 | |
| dc.language.iso | en | en_US |
| dc.publisher | Pergamon-elsevier Science Ltd | en_US |
| dc.relation.ispartof | Computers & Operations Research | |
| dc.rights | info:eu-repo/semantics/closedAccess | en_US |
| dc.subject | Project Scheduling | en_US |
| dc.subject | Time/Cost Trade-Off | en_US |
| dc.subject | Benders Decomposition | en_US |
| dc.title | Discrete Time/Cost Trade-Off Problem: a Decomposition-Based Solution Algorithm for the Budget Version | en_US |
| dc.title | Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version | tr_TR |
| dc.type | Article | en_US |
| dspace.entity.type | Publication | |
| gdc.author.id | Hazir, Oncu/0000-0003-0183-8772 | |
| gdc.author.id | Haouari, Mohamed/0000-0003-0767-8220 | |
| gdc.author.scopusid | 23034277700 | |
| gdc.author.scopusid | 6603727637 | |
| gdc.author.scopusid | 7003748258 | |
| gdc.author.wosid | Haouari, Mohamed/E-6786-2011 | |
| gdc.author.wosid | Hazir, Oncu/C-8920-2013 | |
| gdc.author.yokid | 1986 | |
| gdc.bip.impulseclass | C4 | |
| gdc.bip.influenceclass | C4 | |
| gdc.bip.popularityclass | C4 | |
| gdc.coar.access | metadata only access | |
| gdc.coar.type | text::journal::journal article | |
| gdc.collaboration.industrial | false | |
| gdc.description.department | Çankaya University | en_US |
| gdc.description.departmenttemp | [Hazir, Oencue] Cankaya Univ, Dept Ind Engn, TR-06530 Ankara, Turkey; [Hazir, Oencue; Erel, Erdal] Bilkent Univ, Fac Business Adm, TR-06800 Ankara, Turkey; [Haouari, Mohamed] Ozyegin Univ, Dept Ind & Syst Engn, Fac Engn, Istanbul, Turkey; [Haouari, Mohamed] King Saud Univ, Princess Fatimah Alnijriss Res Chair AMT, Coll Engn, Riyadh 11451, Saudi Arabia | en_US |
| gdc.description.endpage | 655 | en_US |
| gdc.description.issue | 4 | en_US |
| gdc.description.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
| gdc.description.scopusquality | Q1 | |
| gdc.description.startpage | 649 | en_US |
| gdc.description.volume | 37 | en_US |
| gdc.description.woscitationindex | Science Citation Index Expanded | |
| gdc.description.wosquality | Q1 | |
| gdc.identifier.openalex | W2102204585 | |
| gdc.identifier.wos | WOS:000272058100005 | |
| gdc.index.type | WoS | |
| gdc.index.type | Scopus | |
| gdc.oaire.accesstype | BRONZE | |
| gdc.oaire.diamondjournal | false | |
| gdc.oaire.impulse | 8.0 | |
| gdc.oaire.influence | 5.318778E-9 | |
| gdc.oaire.isgreen | true | |
| gdc.oaire.keywords | 000 | |
| gdc.oaire.keywords | Optimality | |
| gdc.oaire.keywords | Benders decomposition | |
| gdc.oaire.keywords | Commerce | |
| gdc.oaire.keywords | Budget control | |
| gdc.oaire.keywords | Project scheduling problem | |
| gdc.oaire.keywords | Benders Decomposition | |
| gdc.oaire.keywords | Time/cost trade-off | |
| gdc.oaire.keywords | Multimodes | |
| gdc.oaire.keywords | Project Scheduling | |
| gdc.oaire.keywords | [INFO] Computer Science [cs] | |
| gdc.oaire.keywords | Total completion time | |
| gdc.oaire.keywords | Time/cost Trade-off | |
| gdc.oaire.keywords | Solution algorithms | |
| gdc.oaire.keywords | Precedence constraints | |
| gdc.oaire.keywords | Project scheduling | |
| gdc.oaire.keywords | Computational results | |
| gdc.oaire.keywords | Time/cost trade-off problem | |
| gdc.oaire.keywords | Exact algorithms | |
| gdc.oaire.keywords | Algorithms | |
| gdc.oaire.keywords | Deterministic scheduling theory in operations research | |
| gdc.oaire.keywords | project scheduling | |
| gdc.oaire.keywords | time/cost trade-off | |
| gdc.oaire.popularity | 1.31305224E-8 | |
| gdc.oaire.publicfunded | false | |
| gdc.oaire.sciencefields | 0211 other engineering and technologies | |
| gdc.oaire.sciencefields | 02 engineering and technology | |
| gdc.oaire.sciencefields | 0202 electrical engineering, electronic engineering, information engineering | |
| gdc.openalex.collaboration | International | |
| gdc.openalex.fwci | 4.0172 | |
| gdc.openalex.normalizedpercentile | 0.94 | |
| gdc.openalex.toppercent | TOP 10% | |
| gdc.opencitations.count | 43 | |
| gdc.plumx.crossrefcites | 19 | |
| gdc.plumx.mendeley | 55 | |
| gdc.plumx.scopuscites | 52 | |
| gdc.publishedmonth | 4 | |
| gdc.scopus.citedcount | 55 | |
| gdc.wos.citedcount | 42 | |
| relation.isOrgUnitOfPublication | 0b9123e4-4136-493b-9ffd-be856af2cdb1 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | 0b9123e4-4136-493b-9ffd-be856af2cdb1 |
