Bilgilendirme: Sürüm Güncellemesi ve versiyon yükseltmesi nedeniyle, geçici süreyle zaman zaman kesintiler yaşanabilir ve veri içeriğinde değişkenlikler gözlemlenebilir. Göstereceğiniz anlayış için teşekkür ederiz.
 

Environmental Risk Assessment of Small Hydropower (Shp) Plants: a Case Study for Tefen Shp Plant on Filyos River

dc.contributor.author Kucukali, Serhat
dc.contributor.authorID 20413 tr_TR
dc.contributor.other 06.05. İnşaat Mühendisliği
dc.contributor.other 06. Mühendislik Fakültesi
dc.contributor.other 01. Çankaya Üniversitesi
dc.date.accessioned 2020-05-08T22:30:13Z
dc.date.accessioned 2025-09-18T12:48:07Z
dc.date.available 2020-05-08T22:30:13Z
dc.date.available 2025-09-18T12:48:07Z
dc.date.issued 2014
dc.description.abstract A multi-criteria scoring tool is used to assess the environmental risk level of small hydropower plants on the basis of documented evidence, measured data, and on-site observations. The assessment is based on evaluating compliance with the standards of the European Bank for Reconstruction and Development (EBRD). The following environmental criteria are assessed: environmental flow, water quality, fish passage and protection, watershed protection, threatened and endangered species. I evaluated the Tefen hydropower plant, which has been in operation on the Filyos River in northwestern Turkey since 2011. The assessment showed that the plant failed all of the EBRD criteria. (C) 2013 International Energy Initiative. Published by Elsevier Inc. All rights reserved. en_US
dc.description.publishedMonth 4
dc.identifier.citation Küçükali, Serhat, "Environmental risk assessment of small hydropower (SHP) plants: A case study for Tefen SHP plant on Filyos River" Energy For Sustainable Development, Vol.19, pp.102-110, (2014). en_US
dc.identifier.doi 10.1016/j.esd.2013.12.010
dc.identifier.issn 0973-0826
dc.identifier.scopus 2-s2.0-84896696947
dc.identifier.uri https://doi.org/10.1016/j.esd.2013.12.010
dc.identifier.uri https://hdl.handle.net/123456789/11962
dc.language.iso en en_US
dc.publisher Elsevier Science Bv en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject Small Hydropower en_US
dc.subject Environmental Risk Assessment en_US
dc.subject Turkey en_US
dc.title Environmental Risk Assessment of Small Hydropower (Shp) Plants: a Case Study for Tefen Shp Plant on Filyos River en_US
dc.title Environmental risk assessment of small hydropower (SHP) plants: A case study for Tefen SHP plant on Filyos River tr_TR
dc.type Article en_US
dspace.entity.type Publication
gdc.author.institutional Küçükali, Serhat
gdc.author.scopusid 6504239195
gdc.description.department Çankaya University en_US
gdc.description.departmenttemp Cankaya Univ, Dept Civil Engn, TR-06810 Ankara, Turkey en_US
gdc.description.endpage 110 en_US
gdc.description.publicationcategory Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı en_US
gdc.description.scopusquality Q2
gdc.description.startpage 102 en_US
gdc.description.volume 19 en_US
gdc.description.woscitationindex Science Citation Index Expanded
gdc.description.wosquality Q2
gdc.identifier.openalex W2072915046
gdc.identifier.wos WOS:000334652100012
gdc.openalex.fwci 8.34137653
gdc.openalex.normalizedpercentile 0.98
gdc.openalex.toppercent TOP 10%
gdc.opencitations.count 37
gdc.plumx.crossrefcites 13
gdc.plumx.mendeley 74
gdc.plumx.scopuscites 37
gdc.scopus.citedcount 37
gdc.wos.citedcount 32
relation.isAuthorOfPublication 75854ffa-126d-4917-b302-5e40883e0878
relation.isAuthorOfPublication.latestForDiscovery 75854ffa-126d-4917-b302-5e40883e0878
relation.isOrgUnitOfPublication 77a9f192-0d56-4f8e-adf2-a1c91a7124c9
relation.isOrgUnitOfPublication 43797d4e-4177-4b74-bd9b-38623b8aeefa
relation.isOrgUnitOfPublication 0b9123e4-4136-493b-9ffd-be856af2cdb1
relation.isOrgUnitOfPublication.latestForDiscovery 77a9f192-0d56-4f8e-adf2-a1c91a7124c9

Files